KCPL OASIS

GENERAL INFORMATION
Transmission service requests must be made through the Southwest Power Pool
Tariffs
Standards of Conduct Information
(new as of Jan. 30, 2009)

Price Notice
Proposed Construction Budget Plan
Generation Interconnection Studies
KCPL - Facility Connection Standard
Simultaneous Import Capability Data
Iatan 2 Transmission Study
Cooper South Flowgate Capacity Increase Fact Sheet
KCP&L Planning Criteria
MINT Contract ATC Adjustments
November 6, 2009, OATT Formula Rate Filing

TRANSMISSION SERVICES
ANCILLARY SERVICES
MISCELLANEOUS
MESSAGES
PROVIDER MAINTENANCE

 
anonymous
SPP Home | Help
       
       
AREVA T&D
OASIS v4.2.11
03/10/2010 09:50:32 CS