General Information

Customer Registration

Customer Notices

Calendar of Events

 

Customer Registration Process

01/01/2008

Curtailment Information

01/12/2009

ITO Organizational Chart

 

Creditworthiness Standards

8/31/2006

 

 

Previously Posted Items

4/4/2008

LG&E/KU Credit Agreement

12/1/2006

 

 

 

 

 

 

 

 

ATC Postings

Tariff

Financial

Daily Firm ATC

Hourly

Tariff

03/30/2009

EKPC Network Rate Formula

5/25/2007

Monthly Firm ATC

Hourly

OATT Business Practices

6/03/2008

Network Rates

05/15/2009

Hourly Non-Firm ATC

Hourly

CBM Methodology

9/29/2008

PTP Rates

05/15/2009

Daily Non-Firm ATC

Hourly

Resale Procedure

7/13/2007

EKPC Network Rates

05/15/2009

Monthly Non-Firm ATC

Hourly

OATT BP Comments & Responses

6/03/2008

Schedule 1 Scheduling System Control and Dispatch Rate

05/15/2009

Flowgate Information

5/5/2009

 

 

Schedule 2 Discount Rates

05/15/2009

Forced Outages in LGEE CA

Hourly

 

 

Monthly Cost of Redispatch

11/6/2008

Outages

Hourly

 

 

 

 

ATC Algorithm

Hourly

 

 

 

 

Reservation Impacts for EKPC-LGEE Interface

5/27/2009

 

 

 

 

Studies

NITS

890 Metrics

Study Reports

 

NITS Application

9/23/2008

SIS Metrics

Quarterly

FAS Studies

02/05/2009

DNR Attestation Form

3/15/2008

Actual vs. Forecasted Load

Daily @ 10 AM

FAS Request Form

05/08/2008

DNR Designation Form

11/13/2008

Scheduled vs. Unscheduled Firm

Daily @ 7 AM

FAS Application for NITS

10/01/2008

DNR Undesignation Form

7/11/2007

10% Change in TTC

Hourly

E.ON US Transmission Planning Guidelines

7/01/2008

E.ON Draft TRM Methodology

12/10/2007

Affiliate vs. NA Historical Data

06/15/2009

System Operating Limits Methodology

7/01/2008

E.ON DNR List

9/19/2008

Affiliate vs. NA TSR Metrics

Monthly

LGIP Agreement Templates

11/18/2008

EKPC DNR List

9/19/2008

Long Term Load Forecast Methodology

08/27/2008

E.ON’s 2008 TEP Update Presentation

12/02/2008

Criteria for Notification of Network Customer Load Changes

03/01/2007

Short Term Load Forecast Methodology

08/27/2008

 

 

 

 

Long Term Load Forecast

11/26/2008

 

 

 

 

LGEE Weather Forecast

Daily

 

 

 

 

Third Party Offers for Congestion

        10/12/2008

Stakeholder Process

Standards of Conduct

Future Six Month Zero ATC

06/08/2009

ITO Semi-Annual Reports

9/28/2008

Standards of Conduct (LGE)

 

Previous Six Month Zero ATC

06/08/2009

Spr ’08 Stakeholder Meeting Materials

6/4/2008

Standards of Conduct (ITO)

3/16/08

Historical Zero ATC’s

06/08/2009

 

 

Disclosures of Information

 

External Links

 

 

 

 

NERC

 

Scheduling

IssueTrak

SERC

 

ITO Backup Tag

4/8/2008

Request for IssueTrak Logon ID

3/30/09

NAESB

 

ITO Backup TSR Form

06/01/2009

Link to SPP IssueTrak

9/23/08

Miscellaneous

 

 

IssueTrak End-User Document

9/23/08

 

 

Phone: 501-614-3506 or 501-614-3505