Other Notices

OG&E FERC Order 890 Posting

OG&E Draft OATT Attachment K

July 18, 2007 - Outage Permission Sheet

OG&E FERC 715 Filing

Thunderstorm Damage - Osage Substation

Arcadia Progress Update (5/15/2006)

Arcadia Progress Update (3/22/2006)

Preliminary Authorization For Expenditure - Arcadia 345kV Sub

Memorial to Skyline Reconductor Project Status Memo


McClain Generating Station

Planning FCITC Study - without McClain and with Upgrades

Planning FCITC Study - without McClain and without Upgrades

McClain Project Outages

Operating Procedure - FERC Order:  McClain

McClain Transmission Projects 08/19/2004

McClain Transmission Projects 09/01/2004 YTD

McClain Transmission Projects 09/15/2004 YTD

McClain Transmission Projects 10/01/2004 YTD

McClain Transmission Projects 10/15/2004 YTD

McClain Transmission Projects 10/29/2004 YTD

McClain Transmission Projects 11/12/2004 YTD

McClain Transmission Projects 12/10/2004 YTD

McClain Transmission Projects 01/07/2005 YTD

McClain Transmission Projects 01/21/2005 YTD

McClain Transmission Projects 02/11/2005 YTD

McClain Transmission Projects 02/24/2005 YTD

McClain Transmission Projects 03/10/2005 YTD

McClain Transmission Projects 03/25/2005 YTD

McClain Transmission Projects 04/08/2005 YTD

McClain Transmission Projects 04/22/2005 YTD

McClain Transmission Projects 05/06/2005 YTD


OG&E 2004 Contingnecy Studies

OG&E 2003 Contingnecy Studies


2006 Transmission Budget

Proposed 2006 Transmission Budget

Proposed 2005 Transmission Budget


Proposed Substations and Transmission Lines (as of 22Oct03)

"NOTE:  This information will be provided at the request of the Oklahoma Corporation Commission for purposes of completing the Electric System Planning Report (ESPR) PUD Cause No. 2002-567, and should not be relied upon for providing information regarding changes in capability of the transmission system."


Transmission Improvements offered to FERC for Market Power Mitigation

WindFarm Curtailments

Arcadia Breaker 382 in service (July 30, 2003)

Encounter - Bechtel / OG&E Substation Construction

Memo - Forced Outage of Arcadia Breaker 382 - 27Jun03

Arcadia Breaker 382 - Substation Construction Schedule

Arcadia Breaker 382 will return to service on August 1, 2003

RedBud - Arcadia Breaker Operation 15May03

Report on TLR Level 5 Events of May 16

16May03 - Redispatch – Muskogee Generation Station

16May03 - Redispatch – Howell - Crissup email

Arcadia 345/138 Bank 3 Transformer failed acceptance tests.  New "In Service" date 08/01/2003.

Redbud Testing: Dynamic Scheduling, Scheduled Interchange an d Checkout Procedure 

Silverlake - Northwest TLR


Data Requests

Oklahoma Corporation Commission Cause No. PUD 200100455 Response to Data Request by an intervener