Date File Name Description
December 6, 2002 BLM Helium Plant-Cliffside Sub(28 kBytes) Operating Guide to protect circuit Y66 from unacceptable voltage fluctuations due to starting 4000HP motors at the BLM Helium plant
August 6, 2003 updated October 17, 2003 SPS North South Constraint(23 kBytes) Description of the SPS internal North South flow constraint
February 11, 2004 AGC Operation Upon loss of Eddy HVDC Tie(30 kBytes) Operating Guide for SPS Control Area Operator contorl of SPS AGC after the sudden trip of the Eddy County HVDC Tie
December 13, 2004 SPS North South Flow 2003-2004 (850 kbytes)
Hourly listing of Metered Flow on SPS North South Flowgate
June 21, 2006 LPL Network Service Interchange Flow Limits Operating Guide for SPS System Operations to protect system during transmission contingencies in the Lubbock area for the summer of 2006.
May 11, 2007 Potter to Finney 345kv line outage generic Operating Guide(36 kBytes) Operating Guide for SPS Transmission Operations to operatie and protect the transmission system during an outage of the Potter to Finney 345kv line
May 11, 2007 Tuco-Oklaunion 345kv Line Outage(30 kBytes) Operating Guide for SPS System Operations to protect system stability while the Tuco-Oklaunion 345kv line is out of service.