Per the tie operator, minimum flow on the Ercot East DC tie is 0.
The East DC tie is released to full service at 1627 CDT on 3/3/10.
The East DC tie is unavailable for scheduling starting Monday, April 19th, at 7:30 am through Friday April 23rd, returning to service by 7:30 pm.
Per the tie operator, minimum flow on the Ercot North DC tie is 25.
The North DC Tie is derated to 210mw indefinately.
*NOTE: The North DC tie is dynamically scheduled from a South to North (Out of ERCOT) direction. SPP does not sell unscheduled Firm or Non-Firm counterflow in this direction.
The Outage scheduled for 03/09/10 from 05:00 to 20:00 has ended. The North DC Tie has been placed back in Service on 03/09/10 @ 1445.
North DC Tie is scheduled to be taken out of service on 5 April 2010 at 0700CDT and is expected to return to service on 16 April 2010 at 1700CDT.
North DC tie is scheduled to be taken out of service on 20 September 2010 at 0700CDT and is expected to return to service on 24 September 2010 at 1700CDT.
EPE states that the minimum flow for the EDDY tie is 35MW
The Eddy Co. DC Tie is back in service as of 1700 CST on 12-29-09. Two hour notice is required to schedule on this tie.
TNPN states that the minimum flow for the Blackwater tie is 15MW
The Blackwater DC Tie is available for full capability as of 2110 CST on 11-22-09.
Per the tie operator, minimum flow on the LAMAR DC tie is 0.
The Lamar DC Tie is available for full capability as of 1700 CST 1-22-2010.
Jimmy Womack
Supervisor, Tariff Administration