Planning Studies
The following Planning studies have been completed and are available.

Year Completed

Assessments and Forecasts

Upload/Update Study
Prior to 2000 1993 System Disturbance Report
 
2000 SPP 2000 Summer Peak Assessment
SPP 2000 Winter Peak Assessment
SPP 2004 Summer Peak Assessment
Demand and Energy Bandwidth Forecast 1999 - 2008
SPP 1999 Summer Peak Assessment
EES/SPP 2000 Collaborative Voltage Study #1
SPP 2000/2001 Winter Assessment (Draft)
 
2001 SPS 2002 Stability Export Limit Study
Transmission Assessment (TAWG 2001) Bulk EHV Study (Phase I Report)
Transmission Assessment (TAWG 2001) Bulk EHV Study (Phase II Report)
SPS Voltage Constrained Import Limits 2001 Fall - 2010 Summer Study
SPS Voltage & Stability Constrained Export Limits 2002 Summer
Operational Stability Performance Study - Tenaska Gateway Partners, LTD's
 
2002 SPP 2002 Summer Peak Assessment
 
2003 2003 Fall LPL Import Limits
2003 Summer LPL Import Limits
InterGen Redbud ATC Study (Revised)
SPP 2003 Summer Peak Assessment
SPP 2003 Winter Peak Assessment
 
2004 Transmission Expansion Review
Missouri_River_Flows_on_SPP
2004 Summer Peak Transmission Assessment
2009 Summer Long Range Assmt
SPS Voltage Constrained Import Limits 2004 Summer- 2010 Winter Study
Lincoln to Circle Transmission Study
Preliminay Cost Allocation Spreadsheets
2004 Winter Peak Assessment
Impacts of Lincoln-Circle 230kV in Kansas (Version Draft 4)
Kansas Panhandle Expansion Plan
Attachment AA Flowgate Upgrade Request Study: AA-2004-003
Attachment AA Flowgate Upgrade Request Study: AA-2004-002
Attachment AA Flowgate Upgrade Request Study: AA-2004-001
 
2005 SPP RTO Expansion Plan - Preliminary Results as of 1/19/05
Impacts of Lincoln-Circle 230KV in Kansas - Final
Summer Assessment 2005
2005-2006 Winter Peak Transmission Assessment
2014 Summer Peak Transmission Assessment
Kansas/Panhandle Sub-Regional Transmission Study
Addendum to the Kansas/Panhandle Sub-Regional Transmission Study

SPP RTO Expansion Plan 2005-2010 - Approved by Board of Directors April 26, 2005
 
2006 2006 SPP/RTO Expansion Planning Summit No. 1
SPP/RTO Expansion Planning 12-month Cycle
SPP Expansion Plan 2006 Proposed Scope
Summer Assessment 2006
SPP Transmission Constraint Mitigation in High Wind Areas
Kansas Expansion Plan
SPP Crez Study
Kansas SCUC Report
2006 STEP Appendix A
2006 STEP Appendix B
SPP Transmission Expansion Plan 2006-2016
 
2007 Ozark Presentation 4-10-07
Kansas Electric Transmission Authority (KETA) Study
SPP Supplemental CREZ Alternative for PUCT April 2007
Southwest Power Pool EHV Overlay Project (Final Report)
Constructability Review: Addendum One to Final Report on the SPP EHV Overlay Project
Ozark Transmission study
SPP EHV Overlay Study (Revised)
Texas Panhandle - Western OK Load Growth Study
2007 SPP Transmission Expansion Plan
SPP Transmission Expansion Plan 2007
 
2008 Norborne Transmission Study - Final Report
Knob Hill-South Beatrice & Clay Center Junction - Greenleaf Transmission Line Study
Knob Hill - S Beatrice & Clay Center Junction - Greenleaf Alternatives - Transmission Line Study - Final Report
Nebraska Integration Team Results
2008 EHV Study Final Report
Blackberry-GRDA1 KCC Analysis FINAL Report
OEPTTF FINAL Report updated
2008 JCSP Executive_Summary
JCSP Report Volume 1
JCSP Report Volume 2
2008 SPP Transmission Expansion Plan
SPP EHV Overlay Study
 
2009 2009 SPP TransCanada Pipeline Study Report
2009 Balanced Portfolio - FINAL Approved Report
DRAFT SPP WITF Wind Integration Study
TWG Priority Projects Phase II Reliability Report Approved
 
2010 Priority Projects Phase II Final Report
2010 SPP Exxon Mobil Transcanada Load Study Report
 
2011 Steady State Analysis of Clay Center Junction to Clifton Transmission Line
 

Please send your requests to Jody Holland :

Jody Holland
Manager, Steady State Planning
Southwest Power Pool Inc.
415 N. McKinley, Suite 140
Little Rock, AR 72205

If you have any questions, please call at 501-614-3315.