2000_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2000-003  7/13/2000  Request to interconnect 280MW on the SPS transmission system Withdrawn (Completed Feasibility Study - Sep. 2000)  Download 
GEN-2000-004 8/16/2000  Request to interconnect 800MW on the AEP West transmission system Withdrawn (Completed Feasibility Study - Oct. 2000)  Download 
GEN-2000-009 10/2/2000  Request to interconnect 500MW on the AEP West transmission system Withdrawn (Feasibility Study complete - Oct. 2000)  Download 
GEN-2000-010 10/25/2000  Request to interconnect 400MW on the AEP West transmission system Withdrawn (Feasibility Study complete January 2001)  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.