Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2000-007 9/25/2000  Request to interconnect 550MW on the AEP West transmission system Withdrawn (Completed Impact Study March 2001)  Download 
GEN-2000-008 9/25/2000  Request to interconnect 550MW on the KCPL transmission system Completed Impact Study March 2001  Download 
GEN-2000-015 12/20/2000  Request to interconnect 180VW on the Western Farmers transmission system Impact Study completed August 2001  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936