2001_Facility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2001-028 8/7/2001  Request to interconnect 520MW on the KCPL transmission system Facility Study Completed November 2002  Download 
GEN-2001-033 9/17/2001  Request to interconnect up to 180 MW on the SWPS system Facility Study completed March 28,2003  Download 
GEN-2001-036 10/5/2001  Request to interconnect 80MW on the SPS transmission system Facilities Study completed December 2003   
GEN-2001-036 10/15/2001  Request to interconnect up to 80MW on the SWPS system Facility Study completed December 2003  Download 
Gen-2001-039A 10/30/2001  Request to interconnect 150 MW on the WPEK System Facililty Study Completed November 2005  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.