Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2001-001 1/15/2001  Request to interconnect 620MW on the KCPL transmission system Feasibility Study complete March 2001 ***WITHDRAWN***  Download 
GEN-2001-002 1/15/2001  Request to interconnect 640MW of generation on the KCPL transmission system Feasibility Study complete March 2001 ***WITHDRAWN***  Download 
GEN-2001-003 2/5/2001  Request to interconnect up to 620MW on the AEPW system Expedited Impact Study requested (see 2001 Impact Studies)   
GEN-2001-004 1/24/2001  Request to interconnect up to 500MW on the SWPS system ***WITHDRAWN***   
GEN-2001-005 1/28/2001  Request to interconnect up to 640MW on the SWPS system Feasibility Study completed May 2001 ***WITHDRAWN***  Download 
GEN-2001-006 2/19/2001  Request to interconnect 700MW on the KCPL transmission system Feasibility Study complete May 2001 ***WITHDRAWN***  Download 
GEN-2001-007 2/19/2001  Request to interconnect 1100MW on the KCPL transmission system Feasibility Study complete May 2001 ***WITHDRAWN***  Download 
GEN-2001-008 3/1/2001  Request to interconnect 500MW on the SPS transmission system Feasibility Study complete August 8, 2001 ***WITHDRAWN***  Download 
GEN-2001-009 3/15/2001  Request to interconnect up to 640MW on the WERE system Expedited Impact Study requested (see 2001 Impact Studies)   
GEN-2001-010 3/15/2001  Request to interconnect up to 640MW on the WERE system Expedited Impact Study Requested (see 2001 Impact Studies) ***WITHDRAWN***   
GEN-2001-011 3/16/2001  Request to interconnect up to 900MW on the AEPW system ***WITHDRAWN***   
GEN-2001-012 3/16/2001  Request to interconnect up to 600MW on the AEPW system ***WITHDRAWN***   
GEN-2001-013 4/24/2001  Request to interconnect up to 26MW on the WFEC system Feasibility Study completed November 2001 ***WITHDRAWN***  Download 
GEN-2001-014 4/24/2001  Request to interconnect up to 96MW on the WFEC system Feasibility Study completed November 2001  Download 
GEN-2001-015 5/17/2001  Request to interconnect up to 180MW on the OKGE system Expedited Impact Study requested (see 2001 Impact Studies) ***WITHDRAWN***   
GEN-2001-016 5/11/2001  Request to interconnect up to 1115MW on the AEPW system Expedited Impact Study requested (see 2001 Impact Studies) ***WITHDRAWN***   
GEN-2001-017 5/11/2001  Request to interconnect up to 557MW on the AEPW system Expedited Impact Study requested (see 2001 Impact Studies) ***WITHDRAWN***   
GEN-2001-018 5/15/2001  Request to interconnect up to 47MW on the WERE system Expedited Impact Study requested (see 2001 Impact Studies)   
GEN-2001-019 5/29/2001  Request to interconnect 750MW on the AEP transmission system Feasibility Study completed June, 2001  Download 
GEN-2001-020 6/4/2001  Request to add a 200MW VFT at Blackwater HVDC Feasibility Study completed November 2001 ***WITHDRAWN***  Download 
GEN-2001-021 6/4/2001  Request to add a 200MW VFT at Eddy County HVDC Feasibility Study completed November 2001 ***WITHDRAWN***  Download 
GEN-2001-022 6/15/2001  Request to interconnect up to 550MW on the AEPW system Expedited Impact Study requested (see 2001 Impact Studies) ***WITHDRAWN***   
GEN-2001-027 8/7/2001  Request to interconnect 520MW on the KCPL transmission system Feasibility Study Completed September 2001 ***WITHDRAWN***  Download 
GEN-2001-033 9/17/2001  Request to interconnect 200MW on the SPS transmission system Feasibility Study Completed November 2001.  Download 
GEN-2001-036 10/15/2001  Request to interconnect up to 80MW on the SWPS system Feasibility Study completed November 2001  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.