2002_Facility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2002-006 4/30/2002  Request to interconnect up to 150MW on the SWPS system. Facility Study completed February 2004  Download 
GEN-2002-008 7/19/2002  Request to interconnect up to 240 MW on the SWPS system Facility Study complete Sept. 16, 2004  Download 
GEN-2002-008 7/19/2002  Request to interconnect up to 240 MW on the SWPS system Addendum to Facility Study GEN-2002-008  Download 
GEN-2002-008 7/19/2002  Request to interconnect up to 240 MW on the SWPS system Final Facility Study Completed 4/6/2005  Download 
GEN-2002-009 7/19/2002  Request to interconnect up to 80MW on the SWPS system Facility Study completed 8/3/2004  Download 
GEN-2002-019 9/12/2002  Request to interconnect up to 160 MW on the SWPS system Facility Study Completed February 2005  Download 
Gen-2002-022 9/12/2002  Request to interconnect 240 MW on the SPWS System Facility Study completed October 2005  Download 
Gen-2002-025A 10/31/2002  Request to interconnect 150 MW on the WPL System Facility Study completed November 2005  Download 
GEN-2002-026 11/13/2002  Request to interconnect up to 140 MW on the WERE system.(Reduced by Customer to 121 MW) Facility Study completed November 2003  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.