2002_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2002-001 1/14/2002  Request to interconnect up to 50MW on the AEPW system Expedited Impact Study Requested (see 2002 Impact Studies) ***WITHDRAWN***   
GEN-2002-002 1/22/2002  Request to interconnect up to 50MW on the SWPS system Expedited Impact Study Requested (see 2002 Impact Studies)   
GEN-2002-003 2/19/2002  Request to interconnect up to 120MW on the WERE system Feasibility Study Completed April 2002 ***WITHDRAWN***  Download 
GEN-2002-004 4/12/2002  Request to Interconnect up to 200MW on the WERE system Feasibility Study Completed May 2002  Download 
GEN-2002-005 4/28/2002  Request to interconnect up to 120MW on the WFEC system Feasibility Study Completed May 2002  Download 
GEN-2002-006 4/30/2002  Request to interconnect up to 150MW on the SWPS system Feasibility Study Completed September 2002  Download 
GEN-2002-007 5/14/2002  Request to interconnect up to 1100MW on the SWPS system Feasibility Study Completed December 2002  Download 
GEN-2002-008 7/19/2002  Request to interconnect up to 240MW on the SWPS system Feasibility Study completed December 2002  Download 
Gen-2002-008 7/19/2001  Requet to interconnect up to 240 MW on t he SWPS system Addendum to Gen-2002-008  Download 
GEN-2002-009 7/19/2002  Request to interconnect up to 240MW on the SWPS system Feasibility Study completed December 2002  Download 
GEN-2002-010 7/30/2002  Request to Interconnect up to 240MW on the WFEC system Expedited Impact Study requested (see 2002 Impact Studies) ***WITHDRAWN***   
GEN-2002-011 7/30/2002  Request to Interconnect up to 160MW on the OKGE system  Expedited Impact Study requested (see 2002 Impact Studies) ***WITHDRAWN***    
GEN-2002-012 9/23/2002  Request to interconnect up to 150MW on the WERE system ***WITHDRAWN***   
GEN-2002-013 9/23/2002  Request to interconnect up to 200MW on the WERE system Feasibility Study completed December 2002 ***WITHDRAWN***  Download 
GEN-2002-014 9/23/2002  Request to interconnect up to 100MW on the AEPW system ***WITHDRAWN***   
GEN-2002-015 9/23/2002  Request to interconnect up to 130MW on the AEPW system Feasibility Study completed December 2002  Download 
GEN-2002-016 8/12/2002  Request to interconnect up to 354MW on the AEPW system Expedited Impact Study requested (see 2002 Impact Studies)   
GEN-2002-017 8/14/2002  Request to interconnect up to 99MW on the WFEC system Feasibility Study completed December 2002  Download 
GEN-2002-018 8/23/2002  Request to interconnect up to 100.8MW on the SWPS system Feasibility Study completed December 2002  Download 
GEN-2002-019 9/12/2002  Request to interconnect up to 160MW on the SWPS system Feasibility Study completed March 2003  Download 
GEN-2002-020 9/12/2002  Request to interconnect up to 75MW on the SWPS system Feasibility Study completed March 2003 ***WITHDRAWN***  Download 
GEN-2002-021 9/12/2002  Request to interconnect up to 160MW on the SWPS system Feasibility Study completed August 2003 ***WITHDRAWN***  Download 
GEN-2002-022 9/12/2002  Request to interconnect up to 240MW on the SWPS system Feasibility Study completed August 2003  Download 
GEN-2002-023 9/24/2002  Request to interconnect up to 150MW on the SWPS system Feasibility Study Completed August 2003  Download 
GEN-2002-024 10/25/2002  Request to interconnect up to 50MW on the WFEC system Expedited Impact Study requested (see 2002 Impact Studies) ***WITHDRAWN***   
GEN-2002-025 10/28/2002  Request to interconnect up to 40MW on the AEPW system ***WITHDRAWN***   
GEN-2002-026 11/13/2002  Request to interconnect up to 140MW on the WERE system Expedited Impact Study requested (see 2002 Impact Studies)   

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.