Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2002-001 1/14/2002  Request to interconnect up to 50MW on the AEPW system Impact Study completed May 2002 ****WITHDRAWN****  Download 
GEN-2002-002 1/22/2002  Request to interconnect up to 50MW on the SWPS system Impact Study completed May 2002  Download 
GEN-2002-003 2/19/2002  Request to interconnect up to 120MW on the WERE system Impact Study completed December 2002 *****WITHDRAWN*****  Download 
GEN-2002-004 4/12/2002  Request to interconnect 200MW to the Westar transmission system. Impact Study completed January 2003  Download 
GEN-2002-004-2 4/12/2002  Request to Interconnect up to 200 MW on the WERE system Impact Study completed February 2005  Download 
Gen-2002-005 4/28/2002  Request to interconnect 120MW on the WFEC system Impact Study completed March 2008  Download 
GEN-2002-005 4/28/2002  Request to interconnect 120MW to the Western Farmers transmission system. Impact Study completed January 2003  Download 
Gen-2002-006 4/30/2002  Request to interconnect 150MW on the SWPS system Impact Re-Study completed September 2008  Download 
GEN-2002-006 4/30/2002  Request to interconnect up to 150MW on the SWPS system Impact Study completed July 2003  Download 
GEN-2002-007 5/14/2002  Request to interconnect up to 1100MW on the SWPS system No impact study performed *****WITHDRAWN*****   
GEN-2002-008 7/19/2002  Request to interconnect 240 MW to the SPS transmission system. Impact Study revised February 2004  Download 
Gen-2002-008 7/19/2002  Request to interconnect 240MW on the SWPS System Impact Study revised August 2007  Download 
Gen-2002-009 7/19/2002  Request to interconnect 80 MW on the SWPS System Revised Impact Study completed November 2005  Download 
GEN-2002-009 7/19/2002  Request to interconnect 240 MW to the SPS transmission system. Impact Study revised February 2004  Download 
GEN-2002-010 7/30/2002  Request to interconnect 240 MW to the WFEC transmission system. Impact Study Completed March 2003  Download 
GEN-2002-011 7/30/2002  Request to interconnect 160 MW to the OGE transmission system. Impact Study Completed March 2003  Download 
GEN-2002-012 9/23/2002  Request to interconnect up to 150MW on the WERE system No impact study performed *****WITHDRAWN*****   
GEN-2002-013 9/23/2002  Request to interconnect up to 200MW on the WERE system No impact study performed *****WITHDRAWN*****   
GEN-2002-014 9/23/2002  Request to interconnect up to 100MW on the AEPW system No impact study performed *****WITHDRAWN*****   
GEN-2002-015 9/23/2002  Request to interconnect up to 130MW on the AEPW system No impact study performed *****WITHDRAWN*****   
GEN-2002-016 8/12/2002  Request to interconnect up to 354MW on the AEPW system Impact Study completed March 2003 **app. 21MB file***  Download 
GEN-2002-017 8/14/2002  Request to interconnect up to 99MW on the WFEC system No impact study performed *****WITHDRAWN*****   
GEN-2002-018 8/23/2002  Request to interconnect up to 100.8MW on the SWPS system No impact study performed *****WITHDRAWN*****   
GEN-2002-019 9/12/2002  Request to interconnect 320 MW to the SWPS transmission system.(Reduced by Customer to 160 MW) Impact Study Completed November 2003  Download 
GEN-2002-019 9/12/2002  Request to interconnect 320 MW to the SWPS Transmission System. (Reduced by Customer to 160 MW) Final Impact Study Completed 11/04  Download 
GEN-2002-020 9/12/2002  Request to interconnect up to 320MW on the SWPS system No impact study performed *****WITHDRAWN*****   
GEN-2002-021 9/12/2002  Request to interconnect up to 160MW on the SWPS system Impact Study completed April 2004 *****WITHDRAWN*****  Download 
GEN-2002-022 9/12/2004  Request to interconnect 240 MW to the SWPS transmission system Final Impact Study completed November 2004  Download 
Gen-2002-022 9/12/2002  Request to interconnect 240 MW on the SWPS system Final Impact Study Completed 8/05  Download 
Gen-2002-022 10/27/2005  Request to interconnect 240MW on the SWPS system Revised Impact Study completed August 2009  Download 
GEN-2002-022 9/12/2002  Request to interconnect 240MW to the SWPS transmission system. Impact Study completed November 2003  Download 
Gen-2002-022-4 9/12/2002  Request to interconnect 240 MW on the SWPS system Revised Impact Study completed September 2005  Download 
GEN-2002-023 9/24/2002  Request to interconnect 150 MW to the SWPS transmission system. Impact Study completed February 2004  Download 
GEN-2002-024 10/25/2002  Request to interconnect 50 MW to the OKGE transmission system. Impact Study completed December 2003 *****WITHDRAWN*****  Download 
GEN-2002-025 10/28/2002  Request to interconnect up to 40MW on the WFEC system No impact study performed *****WITHDRAWN*****   
Gen-2002-025A 10/31/2002  Request to interconnect 150 MW on the WPL System Impact Study completed December 30, 2004  Download 
GEN-2002-026 11/13/2002  Request to interconnect up to 140MW on the WERE system Impact study completed September 2003  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.