The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2003-004 6/5/2003  Request to Interconnect up to 100 MW in the WFEC System Facility Study completed November 2004  Download 
GEN-2003-004 6/5/2003  Request to Interconnect up to 100 MW on the WFEC System Facility Study revised March 2005  Download 
Gen-2003-005 6/5/2003  Request to interconnect 100 MW on the WFEC System Facility Study completed April 2005  Download 
Gen-2003-005 6/5/2003  Request to interconnect 100 MW on the WFEC System Facility Study revised November 2005  Download 
Gen-2003-005 6/5/2003  Request to interconnect 100 MW on the WFEC system Facility Study amended February 2006  Download 
GEN-2003-006A 7/9/2003  Request to interconnect 200MW on the WPEK System Facility Study completed October 2006  Download 
GEN-2003-013 7/29/2003  Request to interconnect 198 MW on the SWPS System Facility Study completed June 2005  Download 
GEN-2003-019 11/24/2003  Request to Interconnect up to 250 MW on the WERE System Facility Study Completed Sept. 13, 2004  Download 
GEN-2003-019a 11/24/2003  Request to interconnect up to 250 MW on the WERE system Facility Study revised Sept. 20, 2004  Download 
Gen-2003-020 12/29/2005  Request to interconnect 160 MW on the SWPS system Facility Study completed May 2005  Download 
GEN-2003-022 12/31/2003  Request to interconnect up to 130 MW on the AEPW system (Customer reduced to 120 MW) Facility Study completed August 2004  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.