2003_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2003-001 3/5/2003  Request to interconnect 100.5 MW on the WFEC system Feasibility Study completed August 2003 ***WITHDRAWN***  Download 
GEN-2003-002 3/11/2003  Request to interconnect 200MW on the WERE system Feasibility Study completed April 2003  Download 
GEN-2003-003 5/23/2003  Request to interconnect 80MW on the SWPS system ***WITHDRAWN***    
GEN-2003-004 6/5/2003  Request to interconnect up to 100MW on the WFEC system Feasibility Study completed September 2003  Download 
GEN-2003-005 6/5/2003  Request to interconnect up to 120MW on the WFEC system Feasibility Study completed December 2003  Download 
GEN-2003-006 6/5/2003  Request to Interconnect up to 100MW on the WFEC system Feasibility Study Completed December 2003 ***WITHDRAWN***  Download 
GEN-2003-007 7/14/2003  Request to interconnect 550MW on the EMDE system ***WITHDRAWN***   
GEN-2003-008 7/15/2003  Request to interconnect up to 240MW on the SWPS system ***WITHDRAWN***   
GEN-2003-009 7/16/2003  Request to interconnect up to 81MW on the SWPS system Feasibility Study Completed October 2003 ***WITHDRAWN***  Download 
GEN-2003-010 7/24/2003  Request to interconnect 50MW on the EMDE system Feasibility Study Completed January 2004  Download 
GEN-2003-011 7/24/2003  Request to interconnect up to 600MW on the EMDE system ***WITHDRAWN***   
GEN-2003-012 7/24/2003  Request to interconnect 350MW on the EMDE system ***WITHDRAWN***   
GEN-2003-013 7/29/2003  Request to interconnect up to 198MW on the SWPS system Feasibilty Study Completed October 2003  Download 
GEN-2003-014 7/29/2003  Request to interconnect up to 550MW on the EMDE system ***WITHDRAWN***   
GEN-2003-015 8/6/2003  Request to interconnect 240MW on the SWPS system Feasibility Study Completed October 2003 ***WITHDRAWN***  Download 
GEN-2003-016 10/13/2003  Request to interconnect 100.5MW on the SPS system Feasibility Study completed January 2004 ***WITHDRAWN***  Download 
GEN-2003-017 10/15/2003  Request to interconnect 80 MW on the SPS system Feasibility Study completed March 2004 ***WITHDRAWN***  Download 
GEN-2003-018 10/22/2003  Request to interconnect up to 298.5MW on the SWPS system Feasibility Study completed May 2003  Download 
GEN-2003-019 11/24/2003  Request to interconnect 250 MW of wind generation on the MIDW system. Feasibility Study Revised 6/30/04  Download 
GEN-2003-019 11/24/2003  Request to interconnect 250 MW of wind generation on the MIDW system. Feasibility Study Completed 6/25/04  Download 
GEN-2003-020 12/29/2003  Request to interconnect 240 MW on the SPS system Feasibility Study completed March 2004  Download 
GEN-2003-021 12/29/2003  Request to interconnect 400 MW on the SPS system Feasibility Study completed March 2004 ***WITHDRAWN***  Download 
GEN-2003-022 12/31/2003  Request to interconnect up to 130MW on the AEPW system Expedited Impact Study Requested (See 2003 Impact Studies)   
GEN-2003-023 12/31/2003  Request to interconnect 100 MW in the WERE system Feasibility Study Completed 7/28/04  Download 
GEN-2003-023 12/31/2003  Request to interconnect 100 MW in the WERE system Revised Feasibility Study Completeed 8/5/04  Download 
GEN-2003-024 12/31/2003  Request to interconnect up to 201MW on the WERE system Feasibility Study Completed 8/19/04  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.