The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2003-002 3/11/2003  Request to interconnect up to 200 MW on the WERE system Impact Study completed Sept. 28, 2004  Download 
GEN-2003-004 6/5/2003  Request to interconnect up to 100 MW on the WFEC system Impact Study (Re-Study) Completed January 2005  Download 
GEN-2003-004 6/5/2003  Request to interconnect up to 100MW on the WFEC system Impact Study completed April 2004  Download 
GEN-2003-005 6/5/2003  Request to interconnect up to 120 MW on the WFEC system Impact Study completed August 2004  Download 
GEN-2003-005 6/5/2003  Request to interconnect 100 MW on the WFEC System (Customer reduced to 100 MW) Impact Study (Re-Study) completed September 2005  Download 
Gen-2003-005 6/15/2003  Request to interconnect 100MW on the WFEC system Impact Re-Study completed September 2008  Download 
Gen-2003-005 6/5/2003  Request to interconnect 100MW on the WFEC system Impact Re-Study completed March 2009  Download 
Gen-2003-006A 7/9/2003  Request to interconnect 200MW on the WPEK system Impact Study completed September 2007  Download 
GEN-2003-009 7/16/2003  Request to interconnect 81MW on the SWPS system Impact Study Completed February 2004 *****WITHDRAWN*****  Download 
GEN-2003-013 7/29/2003  Request to interconnect 198MW on the SWPS system Impact Study completed March 2004  Download 
GEN-2003-013 7/29/2003  Request to interconnect 198 MW in the SWPS System Addendum to Impact Study GEN-2003-013 (Revised 8/26/05)  Download 
GEN-2003-013-2 7/29/2003  Request to interconnect up to 198MW on the SWPS system Impact Study revised 6/25/2004  Download 
GEN-2003-018 10/22/2003  Request to interconnect up to 298.5 MW to the SPS System Impact Study Completed 12/2004 ***WITHDRAWN***   Download 
Gen-2003-019 11/24/2003  Request to interconnect 250MW on the MIDW System Impact Study completed February 2007  Download 
GEN-2003-019 11/24/2003  Request to interconnect up to 250MW on the MIDW system Impact Study completed 7-23-2004 ~7.0 MB  Download 
Gen-2003-019 11/24/2003  Request to interconnect 250MW on the MIDW system Impact Re-Study completed November 2007  Download 
GEN-2003-019-2 11/24/2003  Request to interconnect up to 250 MW on the MIDW system Revised Impact Study completed 6/7/2005  Download 
GEN-2003-020 12/29/2003  Request to interconnect up to 240 MW on the SWPS system. (Customer reduced to 160 MW.) Impact Study completed December 2004  Download 
GEN-2003-020 12/29/2003  Request to interconnect up to 240 MW on the SWPS System (customer reduced to 120 MW) Impact Study Re-Study completed May 2, 2006  Download 
Gen-2003-020 12/29/2003  Request to interconnect 160MW on the SWPS system Impact Re-Study completed January 2009  Download 
GEN-2003-022 12/31/2003  Request to Interconnect 130 MW on the AEPW system Impact Study completed June 2004  Download 
GEN-2003-022-2 12/31/2003  Request to interconnect 130 MW on the AEPW System Impact Study Revised 7/2004  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.