2004_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
GEN-2004-001 1/6/2004  Request to interconnect up to 200MW on the SWPS system ***WITHDRAWN***    
GEN-2004-002 1/16/2004  Request to interconnect up to 200 MW on the WERE system Feasibility Study Completed 9/28/04 ***WITHDRAWN***   Download 
GEN-2004-003 2/4/2004  Request to interconnect up to 240MW on the SWPS system Feasibility Study Completed 12/2004  Download 
GEN-2004-004 2/4/2004  Request to interconnect up to 240MW on the SWPS system ***WITHDRAWN***   
GEN-2004-005 2/9/2004  Request to interconnect up to 275MW on the SPRM system Feasibility Study Completed June 2004  Download 
GEN-2004-006 3/25/2004  Request to interconnect up to 100MW on the WERE system ***WITHDRAWN***    
GEN-2004-007 3/25/2004  Request to interconnect up to 150MW on the WERE system ***WITHDRAWN***    
GEN-2004-008 3/26/2004  Request to interconnect up to 900MW on the KCPL system Expedited Impact Study requested   
GEN-2004-009 3/30/2004  Request to interconnect up to 80MW on the SWPS system Feasibility Study Completed 1/31/05 ***WITHDRAWN***   Download 
GEN-2004-010 4/7/2004  Request to interconnect up to 300 MW on the WERE System Feasibility Study completed 10/19/04  Download 
GEN-2004-011 4/16/2004  Request to interconnect up to 201MW on the KCPL system Feasibility Study completed 12/10/04 ***WITHDRAWN***   Download 
GEN-2004-012 4/20/2004  Request to interconnect up to 900MW on the KCPL system Expedited Impact Study requested    
GEN-2004-013 4/20/2004  Request to interconnect up to 900MW on the KCPL system Expedited Impact Study requested    
GEN-2004-014 4/22/2004  Request to interconnect up to 154.5MW on the MIDW system Feasibility Study Completed 4/12/2005  Download 
GEN-2004-015 7/12/2004  Request to interconnect up to 170 MW on the SWPS system Expedited Impact Study requested    
GEN-2004-016 7/15/2004  Request to interconnect up to 150 MW on the WERE system Fesibility Study Completed April 13, 2005  Download 
GEN-2004-017 8/23/2004  Request to interconnect 250 MW on the EDE system Feasibility Study completed 5/9/05  Download 
GEN-2004-018 9/15/2004  Request to interconnect up to 800MW on the WFEC System. Feasibility Study completed Jan. 25, 2005 ***WITHDRAWN***   Download 
GEN-2004-019 9/22/2004  Request to interconnect up to 40.5MW on the WFEC system Feasibility Study completed March 2005 ***WITHDRAWN***   Download 
GEN-2004-020 10/8/2004  Request to interconnect up to 36MW on the AEP system **Customer reduced to 27 MW** Feasibility Study completed March 2005  Download 
GEN-2004-021 10/8/2004  Request to interconnect up to 150 MW on the WFEC system  Feasibility Study completed March 2005 ***WITHDRAWN***   Download 
GEN-2004-022 10/8/2004  Request to interconnect up to 60 MW on the AEPW system Feasibility Study completed March, 8 2005 ***WITHDRAWN***   Download 
GEN-2004-024 12/13/2004  Request to interconnect 201 MW on the WERE system Feasibility Study completed 7/12/05  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.