2006_Impact_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
Gen-2006-002 1/9/2006  Request to interconnect 150MW on the AEPW System Impact Study Completed December 2006  Download 
GEN-2006-002 8/25/2010  Interconnect 101 MW to AEPW transmission system Study Posted 9/29/2010  Download 
Gen-2006-003 2/7/2006  Request to interconnect 50MW on the MIPU System (Reduced to 30MW) Impact Study completed January 2007  Download 
Gen-2006-006 2/16/2006  Request to interconnect 205.5MW on the WPEK system Impact Study completed February 2008  Download 
Gen-2006-008 2/27/2006  Request to interconnect 550MW on the AEPW system Impact Study completed December 2006  Download 
Gen-2006-010 2/27/2006  Request to interconnect 620MW on the AEPW System Impact Study completed January 2007  Download 
Gen-2006-010 2/27/2006  Request to interconnect 620 MW on the AEPW system Impact Study reposted on January 25, 2007  Download 
Gen-2006-014 3/2/2006  Request to interconnect 300MW on the MIPU System Impact Study completed February 2007  Download 
Gen-2006-014 3/2/2006  Request to interconnect 300MW on the MIPU system Impact Re-Study completed January 2008  Download 
Gen-2006-015 4/24/2006  Request to interconnect 170MW on the SWPS system Expedited Impact Study completed June 2006  Download 
Gen-2006-017 6/2/2006  Request to interconnect 300 MW on the MIPU system Impact Study completed May 2007  Download 
Gen-2006-017 6/2/2006  Request to interconnect 300MW on the MIPU system Impact Re-Study completed January 2008  Download 
Gen-2006-018 6/14/2006  Request to interconnect 170MW on the SWPS system Impact Study completed December 2006  Download 
GEN-2006-018 6/14/2006  Interconnect 170MW on the SWPS transmission system Impact Restudy reposted 3/24/2010  Download 
Gen-2006-019 6/19/2006  Request to interconnect 275MW on the SPRM system Impact study posted February 2007  Download 
Gen-2006-020S 6/20/2006  Request to interconnect 18.9MW on the SW PS System Impact Study posted January 17, 2007  Download 
Gen-2006-020S 6/20/2006  Request to interconnect 18.9 MW on the SWPS system Impact Re-Study completed November 2007  Download 
GEN-2006-020S 10/1/2010  Interconnect 20MW on the SWPS transmission system Posted 12/8/2010  Download 
Gen-2006-020S 6/20/2006  Request to interconnect 18.9MW on the SWPS system Impact Re-Study completed May 2009  Download 
Gen-2006-021 6/21/2007  Request to interconnect 250MW on the WPEK system Impact Study completed June 2007  Download 
Gen-2006-021 (Re-Study) 6/21/2006  Request to interconnect 250MW on the WPEK system Re-Study posted October 2007  Download 
Gen-2006-022 6/21/2007  Request to interconnect 150MW on the WPEK system Impact Study completed August 2007  Download 
Gen-2006-024S 7/7/2006  Request to interconnect 19.8MW on the WFEC system Impact Study completed February 2007  Download 
Gen-2006-025 7/7/2006  Request to interconnect 150MW on the SWPS system Impact Study completed July 2007  Download 
Gen-2006-026 7/26/2006  Request to interconnect 502MW on the SWPS System Impact Study completed November 2006  Download 
Gen-2006-027 8/11/2006  Request to interconnect 320MW on the WERE system Impact Study completed February 2006  Download 
Gen-2006-028 8/11/2006  Request to interconnect 300MW on the WERE system Impact Study completed April 2007  Download 
Gen-2006-031 8/16/2006  Request to interconnect 75MW on the MIDW system Impact Study completed April 2007  Download 
Gen-2006-032 8/21/2006  Request to interconnect 210 MW on the MIDW system Impact Study completed April 2007  Download 
GEN-2006-032 8/21/2006  Request to interconnect 210MW on the MIDW system Re-Study completed January 2008  Download 
Gen-2006-033 8/22/2006  Request to interconnect 150MW on the WERE system Impact Study completed June 2007  Download 
Gen-2006-034 8/23/2006  Request to interconnect 81MW on the SUNC system Impact Study completed June 2007  Download 
Gen-2006-035 8/29/2006  Request to interconnect 225MW on the AEPW system Impact Study completed July 2007  Download 
Gen-2006-035 8/29/2006  Request to interconnect 225MW on the AEPW system Impact Re-Study completed May 2008  Download 
Gen-2006-037 9/15/2006  Request to interconnect 900 MW on the OKGE system Impact Study completed April 2007  Download 
GEN-2006-037N1 4/15/2011  Restudy to Interconnect 75MW to the NPPD transmission system  Posted 7/25/2011  Download 
GEN-2006-037N1 9/30/2009  Generator Modification Evaluation (Turbine Change) Posted 2/3/2014  Download 
Gen-2006-038 10/16/2006  Request to interconnect 750MW on the WFEC system Impact Study completed September 2007  Download 
Gen-2006-039 10/30/2006  Request to interconnect 400MW on the SWPS system Impact Study completed August 2007  Download 
Gen-2006-040 11/7/2006  Request to interconnect 108MW on the SUNC system Impact Study posted October 2007  Download 
Gen-2006-040 11/7/2006  Request to interconnect 108 MW on the SUNC System Impact Re-Study completed November 2008  Download 
Gen-2006-043 11/17/2006  Request to interconnect 126MW on the AEPW system Impact Re-Study completed March 2009  Download 
Gen-2006-043 11/17/2007  Request to interconnect 300MW on the AEPW system Impact Study completed October 2007  Download 
Gen-2006-044 12/4/2006  Request to interconnect 400MW on the SWPS system Impact Study completed February 2008  Download 
Gen-2006-044 12/4/2006  Request to interconnect 400MW on the SWPS System Impact Re-Study completed August 2008  Download 
GEN-2006-044 10/15/2010  Interconnect 370MW on the SPS transmission system  Study posted 2-23/2012  Download 
GEN-2006-044 10/29/2010  Interconnect 370MW on the SWPS transmission system Restudy posted 12/16/2010  Download 
GEN-2006-044N 8/9/2010  Request to interconnect 40.5MW on the NPPD system Interim Impact Study posted August 2010  Download 
GEN-2006-044N02 11/22/2010  Restudy to Interconnect 99.2MW to the NPPD transmission system Posted 2/23/2011  Download 
GEN-2006-045 12/5/2006  Request to Interconnect 240MW on the SWPS system using different wind turbine technology Restudy posted 9/22/2011  Download 
Gen-2006-045 12/5/2006  Request to interconnect 240MW on the SWPS system Impact Study completed October 2007  Download 
Gen-2006-046 12/5/2006  Request to interconnect 130MW on the OKGE system Impact Study completed November 2007  Download 
GEN-2006-046 9/1/2010  Interconnect 130MW to the OKGE transmission system Posted 10/13/2010  Download 
Gen-2006-046 12/5/2006  Request to interconnect 130.2MW on the OKGE system Impact Re-Study #2 completed August 2008  Download 
Gen-2006-046 12/5/2006  Request to interconnect 130MW on the OKGE system Impact Re-Study completed April 2008  Download 
GEN-2006-047 6/11/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 10/4/2013  Download 
Gen-2006-047 12/5/2006  Request to interconnect 240MW on the SWPS system Impact Study completed January 2008  Download 
Gen-2006-048 12/8/2006  Request to interconnect 150MW on the SW PS system Impact Study completed December 2007  Download 
Gen-2006-049 12/18/2006  Request to interconnect 400MW on the SWPS system Impact Study completed May 2008  Download 
Gen-2006-049 12/18/2006  Request to interconnect 400MW on the SWPS system Impact Re-Study completed April 2009  Download 
GEN-2006-049 10/24/2008  Interconnect 400MW to the SPS transmission system Posted 2/27/2012  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.