The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
Gen-2007-002 1/29/2007  Request to interconnect 160MW on the SWPS system Facility Study completed January 2008  Download 
Gen-2007-003 1/30/2007  Request to interconnect 30MW on the SUNC system Facility Study completed November 2008  Download 
Gen-2007-004 2/1/2007  Request to interconnect 150MW on the SWPS system Facility Study completed May 2008  Download 
GEN-2007-005 8/13/2009  Interconnect 200MW to the SWPS transmission system Posted 2/10/2010 - Reposted 3/11/2010  Download 
Gen-2007-006 2/14/2007  Request to interconnect 200MW o n the OKGE System Facility study completed August 208  Download 
GEN-2007-007 8/1/2009  Interconnect 300MWon the SWPS transmission system Posted 3/17/2010  Download 
GEN-2007-008 8/1/2009  Interconnect 300MW on the SWPS transmission system Posted 3/17/2010  Download 
Gen-2007-011 3/9/2007  Request to interconnect 135MW on the SUNC system Facility Study completed March 2009  Download 
Gen-2007-013 3/23/2007  Request to interconnect 99MW on the SUNC system Facility Study completed March 2009  Download 
GEN-2007-015 3/1/2007  Facility Study for 130MW Facility on Westar System Posted November, 2009  Download 
Gen-2007-017 4/13/2008  Request to interconnect 100.5 MW on the MIPU System Facility Study completed July 2009  Download 
GEN-2007-021 8/1/2009  Interconnect 201 MW to the OKGE transmission system Posted 2/1/2010  Download 
GEN-2007-025 8/13/2009  Facility Study for GEN-2007-025 Posted 1/13/2010  Download 
GEN-2007-032 8/1/2009  Interconnect 150MW to the WFEC transmission system Posted 3/11/2010  Download 
GEN-2007-034 8/1/2009  Interconnect 150MW to the SWPS transmission system Posted 3/11/2010  Download 
GEN-2007-038 8/13/2009  Interconnect 200MW on the SUNC transmission system Posted 5/12/2010  Download 
GEN-2007-040 3/4/2010  Interconnect 200MW to the SUNC transmission system Posted 7/15/2010  Download 
GEN-2007-043 8/13/2009  Facility Study for GEN-2007-043 Posted on 1/13/2010  Download 
GEN-2007-044 8/1/2009  Interconnect 300 MW to the OKGE transmission system Posted 2/1/2010  Download 
GEN-2007-045 8/1/2009  Interconnect 171MW to the SWPS transmission system Posted 3/11/2010  Download 
GEN-2007-046 8/13/2009  Interconnect 199.5MW of generation to the SWPS transmission system Posted 2/10/2010  Download 
GEN-2007-048 8/13/2009  Interconnect 400MW to the SWPS transmission system Posted 2/10/2010  Download 
GEN-2007-050 8/13/2009  Facility Study for GEN-2007-050 Posted 1/13/2010  Download 
GEN-2007-051 8/1/2009  Interconnect 200MW to the WFEC transmission system Posted 2/1/2010  Download 
GEN-2007-052 8/1/2009  Interconnect 150MW to the WFEC transmission system Posted 2/1/2010  Download 
GEN-2007-053 11/1/2009  Interconnect 110MW to the KCPL transmission system Posted 2/10/2010  Download 
GEN-2007-057 8/1/2009  Interconnect 34.5MW to the SWPS transmission system Posted 3/11/2010  Download 
GEN-2007-062 8/1/2009  Interconnect 765 MW to the OKGE transmission system Posted 2/1/2010  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936