The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
Gen-2008-002 1/22/2008  Request to interconnect 75MW on the KACP system Impact Study completed August 2008  Download 
Gen-2008-003 1/25/2008  Request to interconnect 120MW on the OKGE system Interim Impact Study completed May 2009  Download 
Gen-2008-005 1/28/2008  Request to interconnect 16MW on the GRDA system Impact study completed August 2008  Download 
Gen-2008-006 1/31/2008  Request to interconnect 30MW on the AEPW system Impact Study completed May 2008  Download 
GEN-2008-008 9/10/2010  Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011  Download 
GEN-2008-013 2/28/2012  Restudy to Interconnect 299.04 MW to the OGE transmission system  Restudy Posted 5/24/2012  Download 
GEN-2008-013 8/25/2016  Impact Restudy for Generator Modification (Turbine Change) Posted 9/26/2016  Download 
GEN-2008-014 9/10/2010  Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011  Download 
GEN-2008-016 3/1/2008  Interconnect 248 MW into SWPS (Restudy new turbine) Posted 9/14/2010  Download 
Gen-2008-016 3/1/2008  Interconnect 248 MW into SWPS (Restudy)  Posted 10/19/2011  Download 
GEN-2008-017 3/1/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 5/13/2013  Download 
GEN-2008-018 3/19/2013  Impact Restudy for Generator Modification (Turbine Change) Posted 6/11/2013  Download 
GEN-2008-018 7/8/2011  Limited Operation Impact Study for Generation Interconnection Request  Posted 2/1/2013  Download 
GEN-2008-018 7/8/2011  Limited Operation Impact Study for Generation Interconnection Request  Posted 8/23/2011  Download 
GEN-2008-018 7/8/2011  Revised Limited Operation Impact Study for Generation Interconnection Request  Posted 9/7/2011  Download 
GEN-2008-018 6/12/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 9/27/2013  Download 
GEN-2008-022 4/25/2014  Impact Restudy for Generator Modification (Turbine change) Posted 7/7/2014  Download 
GEN-2008-022 4/25/2014  Impact Restudy for Generator Modification (Turbine change) Re-Posted 9/2/2014  Download 
GEN-2008-023 5/20/2011  Interconnect 150MW to the AEP transmission system Posted 7/29/2011  Download 
GEN-2008-037 9/1/2010  Interim Impact Study for 100MW on WFEC transmission system Posted 10/19/2010  Download 
GEN-2008-038 7/15/2010  Restudy of Definitive Interconnection System Impact Posted 12/9/2010  Download 
GEN-2008-044 7/15/2010  Interim Operational Study for 227MW on OKGE transmission system Posted 12/30/2010  Download 
GEN-2008-047 3/3/2014  Impact Restudy for Generator Modification (Turbine change)  Posted 5/30/2014  Download 
GEN-2008-051 3/29/2011  Limited Operation Impact Study for Generation Interconnection Request  Posted 5/24/2011  Download 
GEN-2008-051 3/1/2010  Limited Operation Impact Study for Generation Interconnection Request  Posted 1/2/2013  Download 
GEN-2008-079 4/20/2011  Limited Operation Impact Study for Generation Interconnection Request  Posted 5/7/2012  Download 
GEN-2008-079 10/20/2010  Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011  Download 
GEN-2008-079 7/29/2010  Interim Impact Study for 100MW on SUNC transmission system Posted 10/20/2010  Download 
GEN-2008-079 4/20/2011  Limited Operation Impact Study for Generation Interconnection Request Posted 5/5/2014  Download 
GEN-2008-086N02 7/31/2009  Limited Operation Impact Study for Generation Interconnection Request  Posted 1/3/2013  Download 
GEN-2008-086N02 7/31/2009  Limited Operation Impact Study for Generation Interconnection Request Posted 2/7/2013  Download 
GEN-2008-088 7/28/2011  Limited Operation Impact ReStudy for Generation Interconnection Request  Posted 9/7/2011  Download 
GEN-2008-088 9/10/2010  Limited Operation Impact Study for Generation Interconnection Request Posted 4/20/2011  Download 
GEN-2008-092 2/13/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 2/27/2015  Download 
GEN-2008-098 5/29/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 7/13/2015  Download 
GEN-2008-098 2/27/2014  Impact Restudy for Generator Modification (Turbine change) Posted 4/1/2014  Download 
GEN-2008-098 9/7/2010  Restudy to Interconnect 100.8MW to the WR transmission system Restudy Posted 1/27/2012  Download 
GEN-2008-098 9/27/2010  Second restudy to Interconnect 100.8MW to the WR transmission system  Posted 4/24/2012  Download 
GEN-2008-123N 7/25/2013  Impact Restudy for Generator Modification (Turbine change) Posted 8/19/2013  Download 
GEN-2008-123N 7/25/2013  Impact Restudy for Generator Modification (Turbine change)  Posted 9/12/2014  Download 
GEN-2008-123N 7/25/2013  Impact Restudy for Generator Modification (Turbine change)  Posted 5/1/2017  Download 
GEN-2008-124 11/10/2010  Limited Operation Impact Study for Generation Interconnection Request Posted 1/7/2011  Download 
ICS-2008-001 1/19/2009  Cluster 1 Impact Study Posted 7/1/2009  Download 
ICS-2008-001-1 8/13/2009  Cluster 1 Impact Study (Restudy) Posted 1/13/2010  Download 
ICS-2008-001-2 4/1/2010  Cluster 1 Impact Study (2nd Restudy) Posted 5/12/2010  Download 
ICS-2008-001-3 7/28/2010  Cluster 1 Impact Study (3rd Restudy) Posted 8/23/2010  Download 
ICS-2008-001-4 10/28/2010  Cluster 1 Impact ReStudy Posted 12/21/2010  Download 
ICS-2008-001-5 1/19/2009  Cluster 1 Impact Re-Study Posted 1/22/13  Download 
ICS-2008-001-6 1/19/2009  Cluster 1 Impact Re-Study Posted 11/18/2013  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.