The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
FCS-2009-001 6/26/2009  Feasibility Cluster Study Posted 6/26/09  Download 
FCS-2009-001 6/26/2009  Feasibility Cluster Study Appendices Study completed 6/26/09  Download 
FCS-2009-002 10/1/2009  Feasibility Cluster Study Posted 12/21/09  Download 
FCS-2009-003 10/1/2009  Feasibility Cluster Study Posted 12/21/09  Download 