2010_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
FCS-2010-001 12/31/2009  Feasibility Cluster Study Posted 2/26/2010 - Reposted 3/3/2010  Download 
FCS-2010-002 3/31/2010  Feasibility Cluster Study Posted 6/25/2010  Download 
FCS-2010-003 7/1/2010  Feasibility Cluster Study  Posted 8/31/2010  Download 
FCS-2010-004 10/1/2010  Feasibility Cluster Study Posted 12/30/2010  Download 
FCS-2010-004 10/1/2010  Feasibility Cluster Study Posted 12/30/2010 - Reposted 1/13/2011  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.