DFS-2012-001 9/24/2012  Facility Study for Shared Facilities in SPS for Denver City Interchange South - Mustang 115kV CKT 1 &2 Rebuild Posted 4/8/2013  Download 
DFS-2012-001-1 9/19/2012  Facility Study for Shared Facilities in SUNC - Holcomb 345/115/13.2kV transformer circuit #2 Posted 6/11/2013  Download 
DFS-2012-002 3/19/2013  Facility Study for Shared Facilities in SPS for TUCO Interchange 345/230/13kV Autotransformer circuit #3 Posted 8/20/2013  Download 
GEN-2012-001 5/3/2012  Interconnect 61.2MW to the SPS transmission system  Posted 7/11/2012  Download 
GEN-2012-002 9/12/2012  Interconnect 101.2MW to the SUNC transmission system  Posted 2/12/2013  Download 
GEN-2012-004 9/12/2012  Interconnect 41.4MW to the OGE tranimissions system Posted 11/28/2012  Download 
GEN-2012-007 9/17/2012  Interconnect 120MW to the SUNC transmission system Posted 2/12/2013  Download 
GEN-2012-009 9/12/2012  Interconnect 15MW Uprate to the SPS transmission system Posted 2/4/2014  Download 
GEN-2012-010 9/12/2012  Interconnect 15MW Uprate to the SPS transmission system Posted 2/4/2014  Download 
GEN-2012-011 9/12/2012  Interconnect 198.9MW to the SUNC transmission system  Posted 7/30/2014  Download 
GEN-2012-016 3/19/2013  Interconnect 312 MW to the OGE transmission system Posted 8/26/2013  Download 
GEN-2012-017 3/19/2013  Interconnect 115MW to the NPPD transmission system  Posted 7/18/2013  Download 
GEN-2012-020 3/19/2013  Interconnect 478 MW to the SPS transmission system Posted 8/20/2013  Download 
GEN-2012-021 10/5/2012  Interconnect 4.8 MW to the LES transmission system  Posted 6/18/2013  Download 
GEN-2012-023 3/19/2013  Interconnect 115MW to the WERE transmission system  Posted 7/10/2013  Download 
GEN-2012-024 3/19/2013  Interconnect 180MW to the ITC transmission system Posted 10/2/2014  Download 
GEN-2012-026 3/19/2013  Interconnect 90 MW Summer / 100 MW Winter to the MIDW transmission system Posted 10/17/2013  Download 
GEN-2012-027 3/1/2013  Interconnect 136MW to the AEPW / AECI transmission system  Posted 8/6/2013  Download 
GEN-2012-028 3/19/2013  Interconnect 74.8 MW to the WFEC transmission system Posted 8/28/2013  Download 
GEN-2012-031 3/19/2013  Interconnect 200.1MW to the OGE transmission system  Posted 7/8/2013  Download 
GEN-2012-032 3/19/2013  Interconnect 300MW to the OGE transmission system  Posted 7/8/2013  Download 
GEN-2012-032 3/19/2013  Interconnect 300MW to the OGE transmission system Revision posted 11/20/13  Download 
GEN-2012-033 3/19/2013  Interconnect 98.8MW to the OGE transmission system  Posted 7/11/2013  Download 
GEN-2012-034 3/19/2013  Interconnect 7 MW (uprate) to the SPS transmission system Posted 8/26/2013  Download 
GEN-2012-034 3/19/2013  Interconnect 7 MW Uprate to the SPS transmission system Posted 2/4/2014  Download 
GEN-2012-035 3/19/2013  Interconnect 7 MW Uprate to the SPS transmission system Posted 2/4/2014  Download 
GEN-2012-035 3/19/2013  Interconnect 7 MW (uprate) to the SPS transmission system  Posted 8/26/2013  Download 
GEN-2012-036 3/19/2013  Interconnect 7 MW (uprate) to the SPS transmission system  Posted 8/26/2013  Download 
GEN-2012-036 3/19/2013  Interconnect 7 MW Uprate to the SPS transmission system Posted 2/4/2014  Download 
GEN-2012-037 3/19/2013  Interconnect 196/203 MW to the SPS transmission system Posted 8/20/2013  Download 
GEN-2012-037 3/19/2013  Interconnect 196/203 MW to the SPS transmission system Posted 2/3/2014  Download 
GEN-2012-037 3/19/2013  Interconnect 196/203 MW to the SPS transmission system  Posted 5/15/2015  Download 
GEN-2012-040 3/19/2013  Interconnect 76.5MW to the WFEC transmission system  Posted 7/9/2013  Download 
GEN-2012-041 3/9/2013  Interconnect 85.3 MW to the OGE transmission system Posted 6/6/2013  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.