2012_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
FCS-2012-001 11/29/2011  Feasibility Cluster Study Posted 3/1/2012  Download 
FCS-2012-002 3/30/2012  Feasibility Cluster Study Posted 6/22/2012  Download 
FCS-2012-003 7/23/2012  Feasibility Cluster Study Posted 8/16/2012  Download 
FCS-2012-004 9/30/2012  Feasibility Cluster Study Posted 12/20/2012  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.