2012_Impact_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
ASGI-2012-006 4/20/2012  Limited Operation Impact Study for Generation Interconnection Request  Posted 4/2/2013  Download 
DISIS-2012-001 4/20/2012  Definitive Interconnection System Impact Study DISIS-2012-001 Posted 7/26/2012  Download 
DISIS-2012-001-1 4/20/2012  Definitive Interconnection System Impact Study Restudy DISIS-2012-001-1 Posted 2/8/2013  Download 
DISIS-2012-001-2 4/20/2012  Definitive Interconnection System Impact Study Restudy DISIS-2012-001-2 Posted 1/22/2014  Download 
DISIS-2012-001-3 4/20/2012  Definitive Interconnection System Impact Study DISIS-2012-001-3  Posted 5/29/2014  Download 
DISIS-2012-001-4 4/20/2012  Definitive Interconnection System Impact Restudy DISIS-2012-001-4  Reposted 7/30/2014, Original Posting 7/29/2014  Download 
DISIS-2012-002 9/30/2012  Definitive Interconnection System Impact Study DISIS-2012-0012 Reposted 2/8/2013, Original Posting 1/31/2013  Download 
DISIS-2012-002-1 9/30/2012  Definitive Interconnection System Impact Study Restudy DISIS-2012-002-1 Posted 5/16/2013  Download 
DISIS-2012-002-2 9/30/2012  Definitive Interconnection System Impact Study Restudy DISIS-2012-002-2 Posted 8/5/2013  Download 
DISIS-2012-002-3 9/30/2012  Definitive Interconnection System Impact Study Restudy DISIS-2012-002-3 Posted 1/23/2014  Download 
DISIS-2012-002-4 9/30/2012  Definitive Interconnection System Impact Study Restudy DISIS-2012-002-4 Posted 6/12/2014  Download 
DISIS-2012-002-5  9/30/2012  Definitive Interconnection System Impact Study Restudy DISIS-2012-002-5  Posted 7/29/2014  Download 
DISIS-2012-002-6 9/30/2012  Definitive Interconnection System Impact study Restudy DISIS-2012-002-6 Posted 10/2/2014  Download 
GEN-2012-001 5/3/2012  Interim Availability Interconnection System Impact Study for Generation Interconnection Request  Posted 5/29/2012  Download 
GEN-2012-002 4/20/2012  Limited Operation Impact Study for Generation Interconnection Request  Posted 10/10/2012  Download 
GEN-2012-002 7/25/2013  Impact Restudy for Generator Modification (Turbine Change) Posted 9/13/2013  Download 
GEN-2012-002 4/20/2012  Limited Operation Impact Study for Generation Interconnection Request Posted 4/2/2013  Download 
GEN-2012-004 6/21/2013  Impact Restudy for Generator Modification (Turbine Change)  Posted 8/23/2013  Download 
GEN-2012-007 4/20/2012  Limited Operation Impact Study for Generation Interconnection Request  Posted 4/2/2013  Download 
GEN-2012-007 and ASGI-2012-006 11/15/2012  Limited Operation Impact Study for Generation Interconnection Request  Posted 1/22/2014  Download 
GEN-2012-011 9/12/2012  Limited Operation Impact Study for Generation Interconnection Request Posted 10/29/2012  Download 
GEN-2012-013 4/20/2012  Interim Operational Impact Study for Generation Interconnection Request Posted 7/18/2012  Download 
GEN-2012-024 1/5/2016  Impact Restudy for Generator Modification (Turbine Change)  Posted 4/27/2016  Download 
GEN-2012-027 3/19/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 11/25/2013  Download 
GEN-2012-027 3/19/2013  Limited Operation Impact Study for Generation Interconnection Request Re-Posted 12/5/2013  Download 
GEN-2012-028 9/28/2012  Impact Restudy for Generator Modification (Turbine Change)  Posted 2/12/2015  Download 
GEN-2012-032 10/3/2014  Impact Restudy for Generator Modification (Turbine Change)  Posted 12/11/2014  Download 
GEN-2012-033 6/15/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 7/8/2015  Download 
GEN-2012-037 3/19/2013  Limited Operation Impact Study for Generator Interconnection Request Posted 12/5/2013  Download 
GEN-2012-040 7/17/2015  Impact Restudy for Generator Modification (Turbine Change) Posted 8/26/2015  Download 
GEN-2012-040 7/17/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 10/23/2015  Download 
PISIS-2012-001 6/30/2012  Preliminary Interconnection System Impact Study Posted 8/17/2012  Download 
PISIS-2012-002 9/30/2012  Preliminary Interconnection System Impact Study Posted 2/28/2013  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.