The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
 1/1/1900      
ASGI-2013-001 LOIS 2/15/2013  Limited Operation Impact Study for Generation Interconnection Request Posted 7/31/2013  Download 
ASGI-2013-004 3/7/2014  Modification Request to interconnect 36.6 MW on the SUNC transmission system Posted 4/10/2014  Download 
ASGI-2013-004 LOIS 11/6/2013  Limited Operation Impact Study for Generation Interconnection Study Posted 12/9/2013  Download 
DISIS-2013-001 3/31/2013  Definitive Interconnection System Impact Study DISIS-2013-001  Posted 7/31/2013  Download 
DISIS-2013-001-1 3/31/2013  Definitive Interconnection System Impact ReStudy DISIS-2013-001-1 Posted 8/30/2013  Download 
DISIS-2013-001-2 3/31/2013  Definitive Interconnection System Impact ReStudy DISIS-2013-001-2 Posted 1/31/2014  Download 
DISIS-2013-001-3 3/31/2013  Definitive Interconnection System Impact ReStudy DISIS-2013-001-3  Posted 7/30/2014  Download 
DISIS-2013-001-4 3/31/2013  Definitive Interconnection System Impact Restudy DISIS-2013-001-4  Posted 10/23/2014  Download 
DISIS-2013-002 9/30/2013  Definitive Interconnection System Impact Study DISIS-2013-002 Posted 1/31/2014  Download 
DISIS-2013-002-1 9/30/2013  Definitive Interconnection System Impact Restudy DISIS-2013-002-1  Posted 7/31/2014  Download 
DISIS-2013-002-2 9/30/2013  Definitive Interconnection System Impact Restudy DISIS-2013-002-2  Posted 10/23/2014  Download 
GEN-2013-002 9/27/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 9/25/2014  Download 
GEN-2013-008 9/27/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 10/8/2013  Download 
GEN-2013-010 3/17/2015  Limited Operation Impact Study for Generation Interconnection Request  Posted 6/12/2015  Download 
GEN-2013-014 10/13/2014  Modification Request to interconnect 25.5 MW on the NPPD transmission system  Posted 11/19/2014  Download 
GEN-2013-019 9/27/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 9/25/2014  Download 
GEN-2013-022 5/26/2016  Impact Restudy for Generator Modification (Inverter Change)  Posted 6/12/2017  Download 
GEN-2013-027 3/20/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 5/27/2015  Download 
GEN-2013-027 3/20/2015  Limited Operation Impact Study for Generation Interconnection Request  Posted 11/12/2015  Download 
GEN-2013-029 6/26/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 1/21/2016  Download 
GEN-2013-029 1/14/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 2/27/2015  Download 
GEN-2013-030 5/31/2016  Modification Request Impact Study  Posted 11/4/2016  Download 
GEN-2013-032 9/27/2013  Limited Operation Impact Study for Generation Interconnection Request  Posted 4/8/15  Download 
PISIS-2013-001 6/30/2013  Preliminary Interconnection System Impact Study PISIS-2013-001 Posted 8/30/2013  Download 
PISIS-2013-002 6/30/2013  Preliminary Interconnection System Impact Study  Posted 2/28/2014  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.