The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
ASGI-2014-002 3/17/2015  Affected System Facility Study for Generation Interconnection Request  Posted 1/11/2016  Download 
ASGI-2014-002  3/17/2015  Affected System Facility Study for Generation Interconnection Request (REVISED)  Posted 2/8/2016  Download 
ASGI-2014-005  5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED)  Posted 2/2/2016  Download 
ASGI-2014-005 5/18/2015  Affected System Facility Study for Generation Interconnection Request  Posted 9/18/2015  Download 
ASGI-2014-005 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED) Posted 11/12/2015  Download 
ASGI-2014-008 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED) Posted 11/12/2015  Download 
ASGI-2014-008 5/18/2015  Affected System Facility Study for Generation Interconnection Request  Posted 9/18/2015  Download 
ASGI-2014-008 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED)  Posted 2/2/2016  Download 
ASGI-2014-009 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED)  Posted 2/2/2016  Download 
ASGI-2014-009 5/18/2015  Affected System Facility Study for Generation Interconnection Request  Posted 9/18/2015  Download 
ASGI-2014-009 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED) Posted 11/12/2015  Download 
ASGI-2014-010 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED) Posted 11/12/2015  Download 
ASGI-2014-010 5/18/2015  Affected System Facility Study for Generation Interconnection Request  Posted 9/18/2015  Download 
ASGI-2014-010  5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED)  Posted 2/2/2016  Download 
ASGI-2014-012 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED)  Posted 2/2/2016  Download 
ASGI-2014-012 5/18/2015  Affected System Facility Study for Generation Interconnection Request  Posted 10/20/2015  Download 
ASGI-2014-012 5/18/2015  Affected System Facility Study for Generation Interconnection Request (REVISED) Posted 11/12/2015  Download 
ASGI-2014-014 3/17/2015  Affected System Facility Study for Generation Interconnection Request Posted 6/23/2015  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.