2014_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
FCS-2014-002 3/31/2014  Feasibility Cluster Study Posted 6/30/2014  Download 
FCS-2014-003 6/30/2014  Feasibility Cluster Study  Posted 8/29/2014  Download 
FCS-2014-004 9/30/2014  Feasibility Cluster Study Posted 12/31/2014  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.