2015_Affected_Systems
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
ASGI-2015-002 5/13/2015  Interim Operation for Generator Interconnection ASGI-2015-002 Posted 6/3/2015  Download 
ASGI-2015-002 8/31/2015  Affected System Interconnection Facility Study for ASGI-2015-002  Posted 2/10/2017  Download 
ASGI-2015-004 8/12/2015  Affected System Interconnection Facility Study for ASGI-2015-004 Posted 7/14/2016  Download 
MISO DISIS-2015-002  10/28/2016  MISO DISIS-2015-002 Affected System Impact Study Posted 11/1/2016  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.