2015_Feasibility_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
FCS-2015-001 12/31/2014  Feasibility Cluster Study  Posted 2/26/2015  Download 
FCS-2015-002  3/31/2015  Feasibility Cluster Study Posted 6/30/2015  Download 
FCS-2015-003 6/30/2015  Feasibility Cluster Study Posted 8/31/2015  Download 
FCS-2015-004 9/30/2015  Feasibility Cluster Study  Posted 12/31/2015  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.