2015_Impact_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
DISIS-2015-001 3/31/2015  Definitive Interconnection System Impact Study DISIS-2015-001  Posted 8/28/2015  Download 
DISIS-2015-001-1 3/31/2015  Definitive Interconnection System Impact Study DISIS-2015-001-1  Posted 12/23/2015  Download 
DISIS-2015-001-2 3/31/2015  Definitive Interconnection System Impact Study DISIS-2015-001-2  Posted 3/9/2016  Download 
DISIS-2015-002 9/30/2015  Definitive Interconnection System Impact Study DISIS-2015-002  Posted 4/29/2016  Download 
DISIS-2015-002-1 9/30/2015  Definitive Interconnection System Impact Study DISIS-2015-002-1  Posted 8/5/2016  Download 
DISIS-2015-002-2 9/30/2015  Definitive Interconnection System Impact Study DISIS-2015-002-2  Posted 11/29/2016  Download 
DISIS-2015-002-3 9/30/2015  Definitive Interconnection System Impact Study DISIS-2015-002-2 3 Posted 7/10/2017  Download 
GEN-2015-001 9/17/2015  Impact Restudy for Generator Modification (Turbine Change)  Posted 11/6/2015  Download 
GEN-2015-005 12/6/2016  Impact Restudy for Generator Modification (Turbine Change)  Posted 12/14/2016  Download 
GEN-2015-013 5/26/2016  Modification Request Impact Study  Posted 7/8/2016  Download 
GEN-2015-021 5/11/2016  Impact Restudy for Generator Modification (Inverter Change) Posted 8/1/2016  Download 
GEN-2015-022 6/24/2016  Modification Request Impact Study  Posted 7/20/2016  Download 
GEN-2015-022 6/10/2016  Modification Request Impact Study  Posted 6/17/2016  Download 
GEN-2015-024 5/22/2016  Impact Restudy for Generator Modification Posted 6/22/2016  Download 
GEN-2015-025 5/22/2016  Impact Restudy for Generator Modification  Posted 6/22/2016  Download 
GEN-2015-034 3/23/2016  Impact Restudy for Generator Modification (Turbine Change)  Posted 3/30/2017  Download 
GEN-2015-034 3/23/2016  Impact Restudy for Generator Modification (Turbine Change) Posted 4/14/2017  Download 
GEN-2015-034 3/23/2016  Impact Restudy for Generator Modification (Turbine Change)  Posted 4/28/2017  Download 
GEN-2015-047 3/17/2017  Impact Restudy for Generator Modification (Turbine Change) Posted 5/25/2017  Download 
GEN-2015-057 1/11/2017  Impact Restudy for Generator Modification (Turbine Change)  Posted 4/28/2017  Download 
GEN-2015-063 2/17/2017  Impact Restudy for Generator Modification (Turbine Change) Posted 6/23/2017  Download 
GEN-2015-073 4/28/2016  Impact Restudy for Generator Modification (Turbine Change)  Posted 3/30/2017  Download 
GEN-2015-087 3/15/2017  Limited Operation Impact Study for Generation Interconnection Request  Posted 3/16/2017  Download 
GEN-2015-088 3/15/2017  Limited Operation Impact Study for Generation Interconnection Request  Posted 3/16/2017  Download 
GEN-2015-096 10/19/2015  Limited Operation Impact Study for Generation Interconnection Request  Posted 9/14/2016  Download 
GEN-2015-096 11/8/2016  Impact Restudy for Generator Modification (Turbine Change) Posted 11/15/2016  Download 
GEN-2015-098 6/22/2016  Impact Restudy for Generator Modification (Turbine Change)  Posted 8/24/2016  Download 
PISIS-2015-001 3/31/2015  Preliminary Interconnection System Impact Study PISIS-2015-001  Posted 8/28/2015  Download 
PISIS-2015-002 9/30/2015  Preliminary Interconnection System Impact Study PISIS-2015-002  Posted 4/25/2016  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.