2016_Affected_Systems
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
ASGI-2016-001 7/27/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request  Posted 8/24/2016  Download 
ASGI-2016-002 7/27/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request  Posted 8/24/2016  Download 
ASGI-2016-005 12/3/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request  Posted 2/9/2017  Download 
ASGI-2016-006 12/3/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request  Posted 2/9/2017  Download 
ASGI-2016-007 12/3/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request  Posted 2/9/2017  Download 
ASGI-2016-011 ASGI-2016-012 ASGI-2016-013 12/8/2016  Generator Interconnection Affected System Impact Study Report Posted 7/5/2017  Download 
J385 7/29/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request (MISO)  Posted 9/26/2016  Download 
J400 8/15/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request (MISO)  Posted 10/11/2016  Download 
J405 8/29/2016  Limited Operation Impact Study for Affected System Generation Interconnection Request (MISO)  Posted 9/16/2016  Download 
J411 1/6/2017  Limited Operation Impact Study for Affected System Generation Interconnection Request (MISO)  Posted 1/19/2017  Download 
J426 1/27/2017  Limited Operation Impact Study for Affected System Generation Interconnection Request (MISO)  Posted 4/19/2017  Download 
J426 8/26/2016  Affected System Interconnection Facilities Study Report (WAPA) Posted 6/20/2017  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.