2017_Impact_Studies
The following Generation Interconnection Studies have been requested.

Study NumberDate RequestedPurpose of StudyRemarksReport
DISIS-2017-001 5/31/2017  Definitive Interconnection System Impact Study #1 of 2017 Delayed—see Download link for more information  Download 
DISIS-2017-002 11/30/2017  Definitive Interconnection System Impact Study #2 of 2017 Delayed -- See Download Link for more information  Download 
PISIS-2017-001 5/31/2017  Preliminary Interconnection System Impact Study #1 of 2017 No requests were entered in this queue cluster   
PISIS-2017-002 11/30/2017  Preliminary Interconnection System Impact Study #2 of 2017  Posted 5/11/2018  Download 

Please send your requests to GIStudies@spp.org :

Manager, Generation Interconnections
Southwest Power Pool, Inc.
201 Worthen Drive
Little Rock, AR 72223-4936

If you have any questions, please email GIStudies@spp.org or submit a ticket on RMS.